Page 8 - Magazine April 2022
P. 8
Cover Theme Contractors News
ASGC Construction
was always performing infrastructure scope under all our luxury amenities, including a private infinity pool,
strengthens its infrastructure arm projects› main contract work packages but we realized garden and beaches. In addition, the project location
there is a gap in the market. Therefore, we established provides future owners with the opportunity to build a
a new division to provide cost-efficient, high quality and customized home they envisioned, beautifully carved
,
in the UAE s construction industry by adopting modern comprehensive infrastructure solutions catering to the between the city, sea and mangroves.
technologies and showing its commitment to reliability, ever-growing demand for world-class infrastructure. The infrastructure works commenced in September
in-house capabilities, and customer satisfaction. The ASGC roads, infrastructure and marine division 2021 and are expected to complete by 2023. The project
As a result, ASGC Construction is recognized as a reliable is currently executing four large projects: Al Gurm scope includes complete infrastructure development
partner for government, public and private organizations Phase II in Abu Dhabi by Aldar Properties, and three of the island with earthworks, landscaping works,
across broad areas of business operations. in Dubai, Nad Al Shiba-2 road works by RTA, Marsa marine works, roads and street lighting. In addition,
Recognizing the increasing need for infrastructure Al Arab by Dubai Holding and Murooj Al Furjan by ASGC is also executing structural works including
projects driven by the UAE government›s vision to Nakheel. ASGC excels in constructing challenging bridges, culverts and causeway works along with the
be the home of world-class infrastructure, ASGC has projects, driven by a comprehensive construction laying of utility networks like wastewater, stormwater,
formed its roads, infrastructure and marine division. methodology which is currently being implemented potable water, irrigation, electrical (LV & MV) and
,
The new division reinforces ASGC s capabilities as across all of these projects. The Al Gurm Phase II telecommunications for the entire island.
a holistic construction solutions provider for public project is particularly exciting for all of our teams due
and private entities with construction, MEP, fit-out, to its location on an island. Sustainability at the core of construction operations
structural steel, façade and concrete services. ASGC roads, infrastructure and marine division supports
,
The roads, infrastructure and marine division offers ASGC, the infrastructure contractor for Al Gurm Aldar s sustainability initiatives at Al Gurm and has
clients complete turnkey solutions with design, Phase II from Aldar Properties made significant progress in incorporating a sustainable
procurement, construction, and finance facilities. ASGC secured the infrastructure works contract building methodology.
ASGC Construction, a vertically integrated, heavy- In addition, it adds value for clients by providing for the 71 plots on the Al Gurm Phase II project in The sustainability steps implemented by ASGC include
weight construction conglomerate known for delivering sustainable construction practices and value engineering Abu Dhabi by Aldar Properties. These 71 plots offer the non-disruption of marine life, sustainable site offices
turnkey and sustainable landmark projects. solutions supported by a highly skilled workforce. stunning beachfront living in a sustainable community generating clean energy for temporary power, plantation
,
Over the last 33 years, ASGC has grown into a key player Sameh Fam, ASGC Managing Director, comments, ASGC s Residents will enjoy access to a natural habitat and of natural mangroves and the use of recycled materials.
6 7