Page 59 - Magazine December 2023
P. 59

RTA Completes 85% of


                    Al Meydan Street Improvement Project
 Dubai Municipality launches


 comprehensive



 safety campaign for



 construction sites


 across Emirate









 Dubai Municipality has launched a robust safety  and professional safety standards that safeguard
 campaign aimed at enhancing compliance with  and improve the safety of all people, particularly
 safety  standards  and  norms  to  create  a  safer  at  construction  sites.  These  efforts  support
 working environment at every construction site  the  organization’s  ambitious  objectives  of
 throughout the Emirate.  creating a smart, sustainable, and cutting-edge
 construction sector in Dubai.
 The  campaign  also  targets  all  engineers,
 consultants,  supervisors,  and  workers,  as  well  Dubai  Municipality  stated  that  it  has  adopted
 as  contracting  and  engineering  consulting  numerous  measures  to  ensure  and  achieve   Dubai’s  Roads  and  Transport  Authority  (RTA)   Agency, RTA.
 companies  in  Dubai.  The  objectives  of  the  the highest standards of safety, in accordance   announced the completion of 85% of the Al Meydan   “The  upcoming  phase  of  the  Al  Meydan  Street
 campaign  include  safeguarding  individuals  with  the  guidelines  highlighted  in  the  ‘Code  of   Street  Improvement  Project,  extending  from  the  Al   Improvement  Project  includes  modifying  entrances
 working at the construction sites, reducing the  Construction  Safety  Practice’.  Most  notable   Khail Street intersection to the Cyclists Club. Works
 number of accidents, dangers, and injuries, and  among  these  is  the  implementation  of  35,672   involved  widening  the  street›s  capacity  from  two   and  exits  of  the  Mohammed  Bin  Rashid  City  for  a
 improving  adherence  to  safety  regulations  and  field  surveillance  visits  on  around  14,858   to three lanes as a minimum, replacing Al Meydan   better traffic flow in the area. Additionally, landscaping
 norms to ensure a secure working environment.  construction  sites  during  this  year.  This  was   Roundabout  with  a  T-shaped  signalised  surface   works are planned at the new Al Meydan intersection.
                                                                 The entire project is expected to be completed by the
 The  Municipality  underscored  that  it  attributes   part  of  the  periodic  tours  conducted  by  the   intersection, and transforming Al Quoz Roundabout   beginning of the second quarter of 2024,” Al Shehhi
 higher  significance  to  worker’s  safety  and   Municipality  to  ensure  safety  standards  at   into an extended street along the route.  added.
 protection as well as fostering a healthy working   construction  sites,  enhance  awareness  among   Through  continuous  improvements  of  Dubai›s
 environment.  As  part  of  this,  the  Municipality   contractors about the significance of adhering to   infrastructure, RTA aims to enhance road efficiency   RTA  inaugurated  a  tunnel  for  bicycle  lanes  in  Al
 has  launched  several  awareness  campaigns  to   standards, and provide all personal protections   to  match  urban  growth  and  support  the  emirate›s   Meydan  area,  measuring  160  meters  in  length
 promote the concepts of structural safety as well   to workers.  and  6.6  meters  in  width,  with  a  capacity  to
 as  the  significance  of  safeguarding  safety  and  In  addition  to  conducting  worker  medical   sustainable  development,  thus  ensuring  smooth   accommodate approximately 800 bicycles per hour.
 health of workers at construction sites.  examinations,  Dubai  Municipality  also  carried   vehicular movement on Dubai›s roads.  The transformation of the surface intersection of the

 In  addition,  Dubai  Municipality  also  supports   out a number of awareness seminars, lectures,   “The recent improvement works aimed to reduce the   cycling  track  into  a  tunnel  has  facilitated  free  and
 the use of several innovative means to prioritize   and workshops under the ‘Safety Tent Activity’   travel time on Al Meydan Street from 8 minutes to   continuous movement on Al Meydan lane, reducing
 and  implement  safety  requirements  in  the   in Jebel Ali and Muhaisnah, which was launched   just  1  minute  during  the  morning  period  and  from   waiting  times  for  cyclists  due  to  the  elimination  of
 construction sites to protect workers from any   as  part  of  the  campaign  activities.  This   7  minutes  to  less  than  1  minute  in  the  evening.   the  surface  intersection.  This  serves  cyclists  by
 risks  that  may  arise.  This  further  echoes  its   was  aimed  at  enhancing  awareness  among   Moreover, congestion at intersections is expected to   connecting development projects in Al Meydan area
 efforts to offer a sustainable health system as   construction  site  workers  about  security  and   drop significantly by 93.3% in average,” said Hamad   to Nad Al Sheba and the Cyclists Club through the
 well as develop and implement the best public   safety requirements.  Al  Shehhi,  Director  of  Roads,  Traffic  and  Roads   dedicated cycling track.



 18  Local News                                                                             Contractors News  19
   54   55   56   57   58   59   60   61   62   63   64