Page 65 - Magazine August 2021
P. 65
Local News
Claymore Security and Safety Consultants
Claymore Security and Safety Consultants established in the year 1987,
and is a trusted name in the field of 3rd party inspection, Certification&
safety related training services on Offshore & Onshore services in
SEWA completes 50% particular with Lifesaving, Firefighting, lifting equipment & Industrial
equipment by using latest technology with experienced engineers by
of strategic line to transfer water applying the best & latest practices.
Claymore has been accredited by required local & International standards
operating not only in UAE, indeed it’s all over GCC with the purpose of
providing reliable and high quality cost effective Inspection services to
all industries, in particular, Petroleum, Marine, Construction and heavy
fabrication Industries.
Inspection Services Safety Consultancy
Safety Training Rental Services
The Sharjah Electricity, Water and Gas Authority Ruler of Sharjah.
(SEWA) has completed 50 percent of the project He stressed that the authority follows the latest
to extend a strategic line to transfer water from Al technical specifications in the production and
Rahmaniya to Al Azra, to enhance the efficiency of distribution of water, adding that the authority is
the network and regulate water pressure, as well as keen to use environmentally friendly materials that
serve all the areas that it passes through, especially maintain quality in the implementation of the water
the Sustainable City next to Al Rahmaniyah and Um network.
Faneen Area. He pointed out that the total cost of the project
Engineer Essam Al Mulla, Director of the Water amounts to about AED20.21 million. The line is
Department at SEWA, explained that the new project is more than 12 kilometres long and has a diameter of
a major step towards enhancing the ability of the SEWA 600mm. Work on the project began last March and
to provide clean water to the emirate›s residents in a is expected to be complete in March 2022, including
sustainable manner and with appropriate pressure. various construction works.
He pointed out that the authority›s strategy is to The team is working diligently to overcome all
develop water projects and their sustainability the difficulties and challenges it faced during the
through expansions and ambitious development implementation, he added.
projects to keep pace with the comprehensive The authority is continuing its efforts to enhance and ISO 2015 : 9001 | ISO 2018 : 45001 | ISO 2015 : 14001
development process witnessed by the emirate strengthen the water transmission and distribution
under the leadership of H.H. Dr. Sheikh Sultan bin networks in all regions of the emirate, he said in
Muhammad Al Qasimi, Supreme Council Member and conclusion. Tel: 04 8848446 | Fax:048841242
Plot No. 597375-, Community 597, Street 65, Near Dubai Refreshments (pepsi) Roundabout Dubai
Investment Park 2, Dubai, UAE | Email: claysafe@emirates.net.ae | www.claymoresafe.com
16