Page 79 - Magazine December 2020
P. 79

Local News                                                                             Contractors News







 Road projects worth Dh115 million completed in Abu Dhabi  RTA completes 72% of works in the intersection of

               Al Khawaneej-Sheikh Zayed bin Hamdan Roads




               Mattar Mohammed Al Tayer, Director-General,  progress of the project at the site. Recently the
               Chairman  of  the  Board  of  Executive  Directors  of  RTA opened the surface signalised junction of Al
               the Roads and Transport Authority, RTA, announced  Khawaneej-Sheikh  Zayed  bin  Hamdan  Al  Nahyan
               that the completion rate of construction works in  Roads,  which  eased  the  traffic  congestion  by  40
               the intersection of Al Khawaneej-Sheikh Zayed bin  percent compared to the situation with the previous
               Hamdan Al Nahyan Roads had reached 72 percent.    Roundabout. Completion rates reached 73 percent in
               Al Tayer expected all work on the intersection to be  the underpass of Al Khawaneej Road, and 45 percent
               completed and the tunnel opened in March 2021.    in the bridge leading to Al Awir. Recently, the RTA
               He also reported that the completion rate of the  completed the surface junction of Al Khawaneej-

               entire Al Khawaneej Road Improvement Project  Al  Amardi Streets as  well  as  the improvements of
               had clocked 52 percent. The project encompassed  junctions of Algeria Street at Al Warqaa nearby
               improving three main intersections on Al Khawaneej  Uptown Mirdif and Shorooq and Ghoroob Mirdif.
               and  Al  Amardi  Streets,  and  the  construction  of  Al Tayer explained, «The improvement of Al Khawaneej
               service  roads  extending  23km  along  Al  Khawaneej  Corridor  is  one of  the key  strategic  projects for
               and Al Amardi Streets.                            improving the links between Dubai and Sharjah
               Al Tayer made these remarks during a tour of the  through  the  improvement  of  vertical  roads  linking

               project accompanied by engineers to inspect the  with the Emirates Road and Sheikh Mohammed bin














 Roads and parking lots worth Dh114.8 million have  the projects were also aimed at keeping pace with
 recently been constructed in Abu Dhabi to ease traffic  the rapid growth and development in the Capital.
 and solve parking woes, authorities announced on  Drainage networks that will collect rainwater were
 Wednesday.  also built and a number of street lights were put up.
 The Abu Dhabi Municipality said that as part of these  The goal is to strengthen Abu Dhabi’s position as a
 infrastructure projects, new roads were built and old  modern city with an ideal infrastructure that meets
 ones repaired; parking lots and service roads were  international standards and specifications.
 constructed; intersections improved; and entry points  “Improving and developing roads and parking spaces
 to residential areas were created.  also raises the commercial and real estate value in
 Besides ensuring road safety on Abu Dhabi Island,  Abu Dhabi city,” said the municipality.








 16                                                                                              17
   74   75   76   77   78   79   80   81   82   83   84