Page 62 - Magazine June 2022
P. 62

Companies News                                                                                                                                                                              Contractors News





         Al-Kharafi and Intermass win                                                                                                 SDPW Completes Land Levelling Works in


         contracts to build 430 villas and townhouses in Masar                                                                        Kalba’s Wadi Al Helo

                                                                                                                                      The Sharjah Directorate of Public Works (SDPW)
         Arada  has  awarded  two  major  contracts  together,  Masaar›s journey to completion, and we have agreed                    has  completed  land  levelling  work  on  31  plots  in
         totalling AED460 million, to build the first residential  an accelerated construction programme with the                     Kalba’s Wadi Al Helo region, specifically in Al Muhtadi
         district at Masaar, Sharjah›s forested megaproject.  contractor to deliver Sendian rapidly, efficiently and                  neighbourhood, and handed them over to the Housing
         Featuring 4,000 villas and townhouses, Masaar is  to an exceptional level of quality.»                                       Department for infrastructure upgrades.
         divided into eight gated districts, all set in woodland  Homes at Sendian, which means oak tree in Arabic,                   There are 11,700 square metres (m2) of plots
         and nature-inspired master plan.                  range in size from two-bedroom townhouses to five-                         available, in addition to a 1403 m2 mosque site. The
         Valued at AED228 million, the contract to build 142  bedroom Sendian Park Villas. Every unit has smart                       project’s purpose is to increase urbanisation in the
         villas in the Sendian district of Masaar was won by  home features as standard, and all are located close                    region.
         Kuwait›s Mohammed Abdulmohsen Al-Kharafi & Sons  to the leisure and entertainment zone in the heart of                       Despite the difficult terrain and low ground level
         (Al-Kharafi). Construction will begin immediately, and  Masaar. All homes in Sendian are now sold out.                       in some areas, Bashayer Al Mansoori, Director of
         work will take 14 months to complete.             Masaar›s second phase, Kaya, was launched for sale                         SDPW’s Kalba branch, confirmed that the project was
         Valued at AED232 million, the second contract to  in October 2021, and Arada will bring forward the                          completed on time and that the department worked in
         build the remaining 288 homes in Sendian was won by  launch of the third phase of the community to this                      accordance with the precautionary requirements for
         Intermass, a Sharjah-based contractor. Construction  quarter thanks to strong buyer demand.                                  the current stage, particularly with 15 construction
         on these homes will also begin immediately, with  The next milestone at Masaar will be the opening of the                    machinery on the site.
                                                                                                                                                    BUILDING CONTRACTING
         work scheduled to take 14 months to complete.     Masaar Experience Centre and its surrounding precinct
         Ahmed  Alkhoshaibi,  Group  CEO  of  Arada,  said,  in June, which will serve as a focal point not just for
         «Masaar has been the bestselling off-plan project in  the community but for the nearby Suyoh district as
         Sharjah since its launch in early 2021 and excitement  well. When finished, the space will include a children›s
         has been growing about the incredible amenities  adventure  playground,  a skate  park, an  outdoor                                        BUILDING CONTRACTING
         and upgraded lifestyle that this community will  amphitheatre and Zad, the popular food district already
         introduce. These contracts are a key moment in  present in Arada›s sister community, Aljada.

























                                                                                                                                    BUILDING THE FUTURE. BUILDING ON TRUST.



                                                                                                                                    Turnkey Contracting Company established in 2017 specialized to provide complete construction package to a wide range of clients in United Arab Emirates.
                                                                                                                                    BUILDING THE FUTURE. BUILDING ON TRUST.
                                                                                                                                    Carry out tasks according to our Client’s design and specifications  utilizing  the  expertise  of  our  well  trained and competent crew of engineers and skilled workers.
                                                                                                                                    Highly regarded company with a proven track record in the projects that it has undertaken.
                                                                                                                                    Committed to continually provide Outstanding Quality of Works and Services as the Main Contractor to a variety of clients in the Construction Industry.
                                                                                                                                    Turnkey Contracting Company established in 2017 specialized to provide complete construction package to a wide range of clients in United Arab Emirates.
                                                                                                                                                T.: + 971 4 288 5555 • F.: + 971 4 284 8899 • E.: info@westzone.com • W.: www.westzone.com
                                                                                                                                    Carry out tasks according to our Client’s design and specifications  utilizing  the  expertise  of  our  well  trained and competent crew of engineers and skilled workers.
          16                                                                                                                        Highly regarded company with a proven track record in the projects that it has undertaken.
                                                                                                                                    Committed to continually provide Outstanding Quality of Works and Services as the Main Contractor to a variety of clients in the Construction Industry.
                                                                                                                                                T.: + 971 4 288 5555 • F.: + 971 4 284 8899 • E.: info@westzone.com • W.: www.westzone.com
   57   58   59   60   61   62   63   64   65   66   67