Page 65 - Magazine May 2023
P. 65

RTA opens two bridges, one tunnel under Falcon




 Interchange Improvement Project  Rashid (Port Rashid), and additional parking spaces  bridge spans 780 metres and has three lanes for
               beneath the new bridge to serve the area,” he added.
                                                                 traffic from Falcon Interchange heading to Al Wasl
                                                                 Road, with a capacity of 5,400 vehicles per hour. The
               “The work entails the opening of two main bridges
               on Al Khaleej Street extending 1825 metres, each of   third bridge extends 985 metres and has two lanes to
               them having   six lanes with a total capacity of 12,000   serve the traffic from Jumeirah Road to Al Mina Street
               vehicles per hour in both directions. The first bridge   and heading toward the Falcon Interchange, with an
               measures 750 metres while the second bridge extends   expected capacity of 3,200 vehicles per hour.
               1075 metres in the Southern direction. These bridges  The  project  also entails the improvement  of roads
               are linked to the new Infinity Bridge and Al Shindagha  spanning 4.8 km, along with the upgrading of surface
               Tunnel  from  Deira  side  as  well  as  the  improved  junctions on Jumeirah Road, Al Mina Street, and
               junctions on Sheikh Rashid Road. Furthermore, a  Sheikh Sabah Al Ahmad Al Jaber Al Sabah Street as
               2-lane tunnel has been opened for left turns from  well as the construction of two pedestrian bridges -
               Khalid Bin Al Waleed Road to Al Mina Street. This  one on Sheikh Rashid Road and the other on Al Mina
               tunnel stretches 500 metres and accommodates up  Street. The project also covers the installation of road
               to 3,200 vehicles per hour,» Al Tayer explained.  lighting, traffic systems, rainwater drainage networks,
               “The contractor is currently finalising the construction   and irrigation system networks.
               of the third bridge in the project which is a single-  “Al Shindagha Corridor Improvement Project is one
               lane slope bridge for right turns from Khalid Bin Al  of  the  largest  projects  currently  being  undertaken
               Waleed Road to Al Khaleej Street. The bridge spans  by RTA with a total estimated cost of AED5.3 billion.
               250 metres and accommodates up to 1,600 vehicles  It  encompasses  the  construction  of  15  junctions
               per hour. Works in progress also include a signalised  spanning 13 km in total. Due to its massive scope, the
               surface junction that connects Al Khaleej Street with  project had been split into five phases. The Corridor
               Al Ghubaiba Road and Khalid Bin Al Waleed Road,  serves Deira and Bur Dubai in addition  to several
               in  addition  to  pavements,  lighting,  traffic  systems,  development projects such as Deira Islands, Dubai

 Dubai’s Roads and Transport Authority (RTA) today  Maktoum, Vice President, Prime Minister and Ruler of   rainwater drainage, and irrigation systems. It is  Seafront, Dubai Maritime City and Mina Rashid. As
 opened two major bridges and a tunnel spanning  Dubai, and the follow-up of H.H. Sheikh Hamdan bin   anticipated that all works will be completed by July  such, it is expected to serve about one million people.
 a total of 2,325 metres, with a capacity of 27,200  Mohammed bin Rashid Al Maktoum, Crown Prince of   this year.»  It will reduce   the travel time from 104 minutes to
 vehicles per hour, as part of the Falcon Interchange  Dubai and Chairman of Dubai Executive Council, to   RTA has recently awarded the first contract under   just 16 minutes by 2030, and the time saved over 20
 Improvement Project located    between Al Khaleej  expedite the completion of the Al Shindagha corridor   Phase  4  of  Al  Shindagha  Corridor  Improvement   years will be worth about AED45 billion,” Al Tayer said
 Street, Khalid Bin Al Waleed Road, and Al Ghubaiba  to keep pace with the ongoing progress of the area   Project.  The  scope  of this  contract  covers  Sheikh   in conclusion.
 Road.  along the corridor and to cater to the demands of   Rashid Road from its junction with Sheikh Khalifa bin
 The two bridges are connected by the Infinity Bridge   urban and population growth.”  Zayed  Street  to  the  Falcon  Interchange  on  Al  Mina
 and Al Shindagha Tunnel from the Northern side  “The Falcon Interchange Improvement Project is a   Street, stretching 4.8 km. Works under this phase
 and will eventually link up with the bridges that RTA  segment of the 13 km-long Al Shindagha Corridor   include the construction of three bridges with a total
 is currently constructing at the junction of Sheikh  Improvement Project, spanning Sheikh Rashid Road,   length of 3.1 km and a capacity of 19,400 vehicles
 Rashid Road and Sheikh Khalifa bin Zayed Street from  Al Mina Street, Al Khaleej Street, and Cairo Street.   per hour for all lanes.
 the Southern side.  The improvement of the Falcon Interchange enables   The first bridge, which extends 1,335 metres and has
 a smooth traffic flow along Al Shindagha corridor (Al   three lanes in each direction, facilitates the traffic
 Mattar  Al  Tayer,  Director-General  and  Chairman  of
 the Board of Executive Directors of RTA, said, “The   Khaleej and Al Mina Street), besides increasing the   flow between Sheikh Rashid Road and the Falcon
 completion of this project is in line with the directives   capacity, efficiency, and traffic safety of these two   Interchange,  with  an  estimated  capacity  of  10,800
 of  His Highness  Sheikh  Mohammed  bin Rashid  Al   roads. It also offers entry and exit points to Mina   vehicles per hour in both directions. The second






 10  Infrastructure                                                                         Contractors News   11
   60   61   62   63   64   65   66   67   68   69   70