Page 51 - September 2020
P. 51

Construction Contracts




               Abu Dhabi’s Modon awards $535m


               residential city deals


                                                               The infrastructure works will begin this year and
                                                              will cover a total area of 15.8 million sq m. Phase
                                                              three of  the project covers 6,153,000 square
                                                              meters, while phase four spans 9,647,000 square
                                                              meters. Both phases make up roughly 45% of the
                                                              total project area.
                                                               Modon began developing the infrastructure for the
                                                              fi rst, second, and fi fth phases of Riyadh City South
                                                              since last year, and offi cially commenced work on
                                                              the remaining phases of the project during 2020.
                                                              The infrastructure work across the third and fourth
                                                              phases includes the construction of internal and
               UAE-based  Modon  Properties has awarded  the   external roads, the installation of lighting systems,
               infrastructure  development  contracts for phases   the construction of water and sewage networks,
               three and four of  Riyadh City South worth AED   the implementation of groundwater level reduction
               1.93 billion ($525 million), in partnership with the   systems, and the installation of rainwater drainage.
               Abu Dhabi Housing Authority.                   Two contractors, Tristar Engineering & Construction
                With this contract awarding,  the total value  of   and Nurol were awarded the contracts for  the
               infrastructure development  deals  for the Riyadh   development of the infrastructure.
               City South has risen to AED 5.83 billion.
               EBS wins deal for Dubai Municipality


               complex


                                                                        two fl oors of parking, a mezzanine and
                                                                        fi ve fl oors with a roof forming the main
                                                                        building  structure and an extended
                                                                        car-parking  building  with ground, two
                                                                        fl oors and a roof fl oor.
                                                                        As per the agreement with the main
                                                                        contractor, the scope of the project
                                                                        covers engineering, fabrication and
                                                                        erection of steel structures in addition
                                                                        to fi reproofi ng.
                                                                        The main building  scope for EBS
                                                                        covers deck slabs – fi rst and second
                                                                        podium  levels,  mezzanine,  anf  fi fth
                                                                        fl oors and the roof, including the roof
                                                                        for the theatre area, left and right sides
                                                                        roof  canopies.  The  deck  slabs  -  fi rst
               Emirates Building Systems (EBS) has won a      and second podium levels, and mezzanine level
               contract to  provide 2,000 tonnes of  steel for   including staircases, steel bridges and sandwich
               the Dubai Municipality’s  upcoming prosecution   panel  roofi ng,  covers  the  scope  of  the  parking
               building and car-park in Umm Hurair, Dubai.    building of the project.
               Designed to be an architectural icon overlooking   The project is to be fi nished by December 2021
               the banks of Dubai Creek, the project, with a built-  with the car-park on priority to be completed by
               up area of 53,000 sq m, comprises ground plus   the year-end.




           38  Contractors News Magazine
   46   47   48   49   50   51   52   53   54   55   56