Page 68 - Magazine March 2021
P. 68
Local News Contractors News
323 houses Work continues
for citizens in the “Al Suyoh 16” area in Sharjah on Al Bustan 8 development project in Liwara
Ajman’s Municipality and Planning Department has mechanisms of developing old neighbourhoods.
The committee to follow up the implementation of the the civilized development and the comprehensive
been progressing with its work on the Al Bustan 8 The Al Busatan 8 Development Project will contribute
initiatives of His Highness the President of the State, renaissance in the country are taken into consideration
Development Project in Liwara, which is touted as an to maximizing real estate area by increasing the
completed construction work for 323 houses for in their implementation. The project includes 323
important tourism project in the corniche area. density and construction area, enhancing the quality
citizens, including internal roads, in the “Al Suyoh 16” dwellings on an area of 407,880.4 square meters,
area in the Emirate of Sharjah, at a cost of about 400 including seven engineering models, five of which The project comes in line with the recommendations of life, and the attractiveness of the area.
of the Ajman 2040 strategic urban plan, which aims It will provide modern building design and improve the
million dirhams. The Director General of the Court are ground floors and the first with 263 dwellings,
achieve balanced urban development in the emirate. internal movement by eliminating the construction of
of His Highness the Crown Prince of Abu Dhabi and and two models consist of a ground floor only with
Sheikh Rashid bin Humaid Al Nuaimi recently irregular streets, while developing internal streets
Chairman of the Committee, Jaber Muhammad Ghanim 60 dwellings. All homes were equipped with second-
reviewed the project, which is a part of the and increasing spaces.
Al-Suwaidi, confirmed that the residential project generation systems of smart smoke detectors, linked
in the “Al-Suyoh 16” area in Sharjah was designed to the “Hisnatak” system, and the construction works department’s efforts to develop and rehabilitate Meanwhile, Dr Eng. Mohammed Ahmed bin Omair
old neighborhoods in the emirate and provide an Al Muhairi, executive director of the Infrastructure
according to the highest international standards, and included fences, external annexes, car canopies,
integrated infrastructure. Development Sector at the department said that work
the latest architectural designs that keep pace with internal roads and all necessary facilities.
The Municipality and Planning Department has on the project has been carried out under highest
prepared a development plan covering all areas of the safety standards, and focuses on developing high rise
emirate and decided to reconsider the objectives and buildings with a focus on spaces.
14 15