                                                                                                                                      visual connection to the city. This lighting system is
                                                                                                                                      powered by energy cube pv panels located on the car
                                                                                                                                      park building. The light installation continues into the
                                                                                                                                      interior of both the ground floor and the sky lobby,
                                                                                                                                      where is becomes more solid.
                                                                                                                                      Vertical Transport Strategy: A vertical transport
                                                                                                                                      strategy is implemented to facilitate separate access
                                                                                                                                      to the various programmes. The high-speed express
                                                                                                                                      lifts connect the four main lobbies (ground/spa /
                                                                                                                                      sky and rooftop) which contain most of the public
                                                                                                                                      programme and the main access for the hotel (at 150
                                                                                                                                      meters). Four office and four guestroom lifts share
                                                                                                                                      the same lift shaft, while the residential apartments
                                                                                                                                      on the higher levels have their own designated lift-
                                                                                                                                      group, making direct access via the basement parking
                                                                                                                                      possible. In total the building provides 17 lifts, of
                                                                                                                                      which 5 are service elevators.
                                                                                                                                      Construction Update
                                                                                                                                      Structural works on 56 floors of Wasl Tower have
                                                           interactive light levels, and deliberated acoustics are                    been  completed,  and  façade  works  have  reached   Project Details
                                                           implemented in all spaces throughout the building,                         level 13. Mechanical, electrical and plumping works   Developer: Wasl Properties
                                                           with a particular focus on public levels, where culinary                   are now at level 52.                               Architectural Consultant: UNStudio
                                                           experience, hosting and aesthetics come together to                        Wasl Tower is expected to be completed by the      Cost Consultant: Kulkarni Quantity Surveyors
                                                           heighten visitor experiences.                                              second quarter of 2024.                            Engineering Consultant: Werner Sobek

                                                                                                                                                                                         Building Contractor: Saleh Constructions
                                                           Concept and Design                                                                                                            Piling Contractor: APCC Piling Foundation
                                                           Structure: Designed around its Z-axis and adopting                                                                            Contracting
                                                           a classic ‘contrapposto’ movement, the wasl Tower                                                                             MEP Consultant: Emirates Falcon
                                                           faces  almost  every  direction.  The  geometry  of  the                                                                      Electromachanical Company
                                                           tower achieved its holistic appearance by means                                                                               MEP Consultant: Seed Engineering Consultants
                                                           of innovative parametric design and high-tech                                                                                 Date Launched: February 2015
                                                           engineering. Every part of the design is connected                                                                            Estimated Handover Date: Q4 2020
                                                           by itself and its counterparts. The mixed-use                                                                                 Revised Estimated Handover Date: Q2 2024
                                                           programme, comprising offices, guest rooms, public                                                                            Construction Started: 2015
                                                           areas and apartments, presented a challenging core
                                                           configuration. A smart structural concept – three
                                                           300m high sheer walls in the core that connect 4
                                                           large outriggers in strategic levels – gives the tower
                                                           an almost free, highly efficient, floor-plate while
                                                           maintaining movement at the top.
                                                           Light and Shade: By day, the ceramic elements of
          This seam is created by a stacking of outdoor    the facade creates a natural cooling system through
          balconies, forming a green vein along the building’s   heat loss and shading techniques. By night, the
          silhouette, and allowing a glimpse of the interior. This   facade lighting, designed by Arup, is housed behind
          boulevard connects the outdoor with the indoor, which   ceramic fins and is programmed to breathe with the
          is a unique feature for this region. Clean materials,   rhythm of this 24-hour metropolis while providing a